Free Gantt Chart Maker: Build a Project Timeline Online

Plan any project in minutes with this free Gantt chart maker. Add your tasks, start and end dates, progress and milestones, and the timeline builds itself. Download it as an image or CSV when you are done. No sign-up needed.

Project length0 days
Start–
Finish–
Overall progress0%

Tasks

TaskStartEndDaysDone

Your tasks are saved automatically in this browser only. Nothing is uploaded or stored on our servers. Click a bar or the Edit button to change a task, and use the Up and Down buttons to reorder tasks.

How Do You Use This Gantt Chart Maker?

The Gantt chart maker works in four simple steps, and every change shows on the timeline straight away.

  • Name your project. Type a project name at the top. It appears on the image you download later.
  • Add your tasks. Enter a task name, a start date and an end date, then click “Add task”. Set the progress percentage and pick a colour if you want to group related work, such as design tasks in purple and development tasks in green.
  • Add milestones. Tick “Milestone” for key dates such as a client sign-off or a launch day. Milestones show as a diamond on the chart.
  • Adjust and share. Click any bar to edit it, use the Up and Down buttons to reorder tasks, switch between day, week and month views, then download a PNG image or a CSV file.

Your tasks are saved in your own browser, so you can close the page and come back later. Nothing is uploaded to our servers. If you want to see how a finished plan looks first, click “Load example project” and edit it.

What Is a Gantt Chart?

A Gantt chart is a bar chart that shows a project schedule over time. Each task is a horizontal bar. Where the bar starts and ends shows when the task begins and finishes, and its length shows how long it takes. Tasks are listed down the left side, and dates run across the top.

The chart is named after Henry Gantt, who designed and popularised it in the 1910s. A Polish engineer, Karol Adamiecki, created a similar diagram even earlier, in 1896. You can read more about the history in the Wikipedia article on Gantt charts.

More than a hundred years later, the idea is the same. A Gantt chart answers three questions at a glance: what needs to happen, when it needs to happen and how far along each piece of work is. That is why every serious project planning software product includes a Gantt or timeline view, and why a simple Gantt chart maker is often all a small team needs to keep a project on track.

What Are the Main Parts of a Gantt Chart?

Every Gantt chart, whether you make it in this Gantt chart maker, in Excel or in paid software, has the same basic parts.

PartWhat it showsIn this tool
Task listEvery piece of work in the projectThe left column and the Tasks table
TimelineDays, weeks or months across the topSwitch views with Days, Weeks or Months
Task barsWhen each task starts and endsColoured bars you can click to edit
ProgressHow much of each task is doneThe darker shading inside each bar
MilestonesKey dates with no durationDiamond markers
Today lineWhere the project stands right nowThe red vertical line

Some advanced tools also show dependencies (arrows that link one task to the next), resource names and critical paths. For most small projects, the parts above are enough to keep everyone on the same page.

Project manager listing tasks and dates to make a Gantt chart

How Do You Make a Gantt Chart Step by Step?

Knowing how to make a Gantt chart is less about the software and more about thinking through the project first. Follow these steps, then enter the results into the free Gantt chart maker above.

  • Write down the goal. One sentence, such as “Launch the new website by 31 March.” Every task should help you reach it.
  • List every task. Break the work into pieces that take between one day and two weeks. Anything longer is usually several tasks hiding as one.
  • Put the tasks in order. Ask what must finish before each task can start. Design usually comes before development, and testing before launch.
  • Estimate how long each task takes. Be honest and add a little buffer. It is easier to finish early than to explain a delay.
  • Set the dates. Start with the first task and work forward. Remember weekends and holidays, which this tool shades in grey.
  • Add milestones. Mark the moments that matter to clients or managers, such as approvals and launch dates.
  • Share it and update it. A Gantt chart is only useful if it stays current. Update progress every week.

If you are new to planning projects, our guide to what project management is explains the basics of scope, planning and tracking in plain English.

What Can You Plan With a Gantt Chart Maker?

Almost any piece of work with a start, an end and a few steps in between fits on a Gantt chart. Here are some of the most common ways people use a Gantt chart maker.

  • Product launches. Map research, design, manufacturing, marketing and launch day on one screen, so every team can see how their work affects the others.
  • Marketing campaigns. Plan content, design, ad set-up and reporting dates. A campaign timeline makes it obvious when two big deadlines clash.
  • Events. Work back from the event date to venue booking, invitations, catering and rehearsals. Milestones are perfect for payment deadlines.
  • Website builds. Show a client every stage, from wireframes to launch, and update progress each week.
  • Dissertations and coursework. Students can split a long piece of work into reading, research, drafting and editing, with a realistic deadline for each.
  • Home and office moves. List notice periods, packing, removals and set-up so nothing is left to the last minute.

Whatever the project, the process in the Gantt chart maker is the same: list the tasks, add the dates, mark the milestones and keep the progress up to date.

How Do You Read a Gantt Chart?

Reading a Gantt chart takes a few seconds once you know where to look. Start on the left and find the task you care about. Follow its row to the right until you reach the coloured bar. The left edge of the bar is the start date, the right edge is the end date and the darker shading inside shows how much is complete.

Next, look at the bars above and below. Bars that overlap show tasks running at the same time, which may need more people. Bars that sit end to end show work that happens in sequence. Finally, find the red today line. Any bar to the left of that line that is not fully shaded is behind schedule.

This is why a chart from a Gantt chart maker works so well in meetings. Instead of reading through a long list of dates, everyone can see the whole plan, spot delays and agree on next steps in a couple of minutes.

Why Use an Online Gantt Chart Instead of a Spreadsheet?

You can build a Gantt chart in Excel or Google Sheets, but it takes time. Excel has no built-in Gantt chart type, so you have to format a stacked bar chart by hand or start from a template. Microsoft’s own Excel Gantt chart page points users to templates for this reason.

An online Gantt chart is faster for most people:

  • No formulas or formatting. Enter a task and dates, and the bar appears in the right place.
  • Easy changes. Move a deadline and the timeline updates instantly.
  • Clear progress. Shaded bars show how much of each task is done.
  • Quick sharing. Download a clean PNG image for a client email or a slide, or a CSV to open in a spreadsheet.

A spreadsheet still makes sense if you need complex formulas or cost tracking. For planning and showing a timeline, a dedicated online Gantt chart maker saves a lot of fiddly work.

Who Uses a Free Gantt Chart Maker?

A free Gantt chart maker like this one is useful for almost anyone who has to plan work with deadlines.

  • Small business owners planning a product launch, a shop fit-out or a new website.
  • Freelancers and agencies showing clients when each stage of a project will be delivered.
  • Marketing teams mapping campaigns, content calendars and event timelines.
  • Students planning dissertations, group projects and revision schedules.
  • Event planners working back from the event date to every booking and deadline.
  • Construction and trades teams sequencing jobs on site so each trade arrives at the right time.

Agencies often pair a timeline with a budget. Once your plan is ready in the Gantt chart maker, our project cost calculator helps you work out what the project will cost and what to quote.

What Does a Simple Gantt Chart Template Look Like?

If you are not sure where to start, use this Gantt chart template for a small website project. Click “Load example project” in the Gantt chart maker to see it on the timeline, then edit it for your own work.

TaskTypical lengthStarts after
Project kick-off (milestone)1 dayContract signed
Research and planning5 daysKick-off
Wireframes5 daysResearch and planning
Visual design6 to 8 daysWireframes
Content writing8 to 12 daysCan overlap with design
Development10 to 14 daysVisual design approved
Testing and fixes5 daysDevelopment
Launch (milestone)1 dayTesting signed off

The same pattern works for most projects: plan, create, review, fix and launch. Change the task names and dates, and you have a project timeline for an app, a marketing campaign or an office move.

What Are Common Gantt Chart Mistakes?

A Gantt chart is a simple tool, but a few habits make it far less useful.

  • Too much detail. A chart with 200 tasks is hard to read, even in the best Gantt chart maker. Group small jobs into one task and keep the chart readable.
  • No buffer time. If every task is planned to the exact day, one sick day pushes the whole project back.
  • Forgetting dependencies. If development starts before design is approved, the timeline looks fine on paper but fails in practice.
  • Never updating progress. A chart that shows last month’s plan gives everyone false confidence.
  • Ignoring weekends and holidays. Check the grey weekend columns and move tasks that land on days nobody is working.

When Do You Need Full Project Planning Software?

This Gantt chart maker is built for planning and sharing a timeline quickly. As projects grow, teams often need more: shared access, task comments, automatic dependencies, workload views and time tracking. That is when full project planning software makes sense.

Many tools include a Gantt or timeline view, but not always on their free plans. Our guide to the free project management tools shows which ones include timelines for free, and our comparison of the best project management software covers the paid options.

If you are planning a larger change, such as moving IT support to an outside provider, a clear timeline is just as important. Semityn Journal’s guide to IT outsourcing includes a 90-day handover plan that works well as a Gantt chart. The Association for Project Management is also a good source for learning more about planning and scheduling.

Frequently Asked Questions About the Gantt Chart Maker

Is this Gantt chart maker free?

Yes. The Gantt chart maker is completely free, with no sign-up, no watermark on the chart area and no limit on the number of tasks.

Are my tasks saved?

Yes, your tasks are saved automatically in your own browser, so they are still there when you come back on the same device. They are not uploaded to any server, so clearing your browser data will remove them.

Can I download my Gantt chart?

Yes. Click “Download PNG” to save the timeline as an image for emails, reports and slides, or “Download CSV” to open the task list in Excel or Google Sheets.

How do I add a milestone?

Tick the “Milestone” box before you add the task. A milestone uses a single date and shows as a diamond on the timeline.

Can I change the timeline view?

Yes. In the Gantt chart maker you can switch between Days, Weeks and Months at the top of the tool. Days works best for short projects, while Weeks and Months make longer projects easier to read.

Does it work on a phone?

Yes. The Gantt chart maker works on phones and tablets. On small screens you can scroll the timeline sideways to see later dates.

What is the difference between a Gantt chart and a timeline?

A simple timeline shows events in order. A Gantt chart also shows how long each task lasts, how tasks overlap and how much of each task is complete.